Milestone: after 1.5 years the roof is now finished. All rooftiles re-set where loose, stuck into place with special pur para tejas (pur for rooftiles), the gaps filled with lime mortar, and the sides and the lime mortar now covered with Sikalastic 127. This is the biggest physical job engineer Jansen ever did, and he’s not keen to repeat it.
To see all posts about the roof project: click here
No comments:
Post a Comment